Production Operations(生产运营)
知识库位置:
FDE Knowledge Base/13 Operating System/09-Production-Operations.md
系统上线后,Project OS 不应该结束。
开始维护:
Production Version(生产版本)Owners(责任人)SLIs / SLOs(服务等级指标/目标)Alerts(告警)Runbooks(操作手册)Incidents(生产事件)Known Issues(已知问题)Cost(成本)Change History(变更历史)Service Ownership(服务归属)
Section titled “Service Ownership(服务归属)”明确:
Business Owner(业务负责人):Technical Owner(技术负责人):Operations Owner(运营负责人):Security Owner(安全负责人):Data Owner(数据责任人):Production Health(生产健康度)
Section titled “Production Health(生产健康度)”建议至少跟踪:
Reliability(可靠性)
Section titled “Reliability(可靠性)”- Availability(可用性)
- Error rate(错误率)
- Latency(延迟)
- Quality(质量)
- Tool success(工具成功率)
- Evaluation regression(评估回归)
Data(数据)
Section titled “Data(数据)”- Freshness(新鲜度)
- Pipeline health(管道健康)
- Data quality(数据质量)
Cost(成本)
Section titled “Cost(成本)”- Cost per request(单请求成本)
- Cost per task(单任务成本)
User(用户)
Section titled “User(用户)”- Adoption(采用)
- Task success(任务成功)
Incident Registry(事件登记)
Section titled “Incident Registry(事件登记)”字段:
Incident ID(事件编号)Severity(严重度)Start(开始时间)End(结束时间)Impact(影响)Systems(涉及系统)Owner(责任人)Mitigation(缓解措施)Root Cause(根因)Corrective Actions(纠正措施)Postmortem(事后复盘)Known Issues(已知问题)
Section titled “Known Issues(已知问题)”生产系统可能存在已接受问题。
统一记录:
Issue(问题)Impact(影响)Workaround(临时规避方案)Owner(责任人)Priority(优先级)Planned Fix(计划修复)