Gold Standard — 13 Prototype Gate(黄金标准:原型门禁)
知识库位置:
FDE Knowledge Base/06 Case Studies/Reference-Projects/01-Enterprise-Knowledge-Assistant/13-Prototype.md
Gate decision(门禁决策):
GO WITH CONDITIONS(有条件放行)Evidence(证据):
- Core Q&A works(核心问答可用)
- Retrieval feasible(检索可行)
- Citation feasible(引用可行)
Conditions(条件):
Permission model required before Pilot.(试点前必须完成权限模型。)
Version filtering required.(必须完成版本过滤。)
Representative evaluation dataset required.(必须完成代表性评估数据集。)