POC Kickoff(概念验证启动)
知识库位置:
FDE Knowledge Base/07 Playbooks/06-POC-Kickoff.md
Playbook Metadata(手册元数据)
Section titled “Playbook Metadata(手册元数据)”Playbook ID: PB-006
Stage(所属阶段):Prototype(原型)
Primary Goal(主要目标):Align everyone on what is being validated and what result changes the next decision.(让所有人明确在验证什么、什么结果会改变下一步决策。)
Typical Duration(典型时长):75 minutes
Primary Audience(主要使用者):FDE + Engineering + Business Owner
Difficulty(难度):Intermediate(进阶)
Status: CoreVersion: v0.1Objective(目标)
Section titled “Objective(目标)”POC(Proof of Concept,概念验证)Kickoff 的目标是让所有人明确:
我们到底在验证什么,以及什么结果会改变下一步决策。
POC ≠ Mini Product(概念验证 ≠ 迷你产品)
Section titled “POC ≠ Mini Product(概念验证 ≠ 迷你产品)”POC 必须围绕 Hypothesis(假设)。
例如:
Hypothesis:RAG can retrieve relevant policy content accurately enough for support agents.(RAG 能足够准确地检索客服所需的政策内容。)而不是:
Build support assistant.(做一个客服助手。)Kickoff Agenda(启动会议程)
Section titled “Kickoff Agenda(启动会议程)”| 时间 | 内容 |
|---|---|
| 0–10 min | Business Problem(业务问题) |
| 10–20 min | Hypotheses(假设) |
| 20–30 min | Scope(范围) |
| 30–40 min | Architecture(架构) |
| 40–50 min | Data / Environment(数据/环境) |
| 50–60 min | Success Criteria(成功标准) |
| 60–70 min | Roles / Timeline(角色/时间线) |
| 70–75 min | Risks & Next Steps(风险与下一步) |
POC Charter(概念验证章程)
Section titled “POC Charter(概念验证章程)”必须明确:
Hypothesis(假设)
Section titled “Hypothesis(假设)”In Scope(范围内)
Section titled “In Scope(范围内)”Out of Scope(范围外)
Section titled “Out of Scope(范围外)”Test Data(测试数据)
Section titled “Test Data(测试数据)”Environment(环境)
Section titled “Environment(环境)”Evaluation(评估)
Section titled “Evaluation(评估)”Success Criteria(成功标准)
Section titled “Success Criteria(成功标准)”Timeline(时间线)
Section titled “Timeline(时间线)”Owner(责任人)
Section titled “Owner(责任人)”Go / No-Go Decision(上/不上决策)
Section titled “Go / No-Go Decision(上/不上决策)”Example(示例)
Section titled “Example(示例)”Hypothesis(假设)
Section titled “Hypothesis(假设)”Hybrid Retrieval(混合检索)improves policy retrieval compared with vector-only search.(相比纯向量检索提升政策检索效果。)
Evaluation(评估)
Section titled “Evaluation(评估)”100 representative questions(100 个代表性问题)。
Success(成功)
Section titled “Success(成功)”达到双方约定的 Retrieval / Answer Quality(检索/回答质量)标准。
Decision(决策)
Section titled “Decision(决策)”若达到标准:
进入 Pilot(试点)。
否则:
调整架构或停止当前方向。
Scope Protection(范围保护)
Section titled “Scope Protection(范围保护)”POC 最常见问题:
Can we also add...(能不能顺便加上……)每次新增需求问:
它是否帮助验证当前 Hypothesis(假设)?
如果不是:
Backlog(待办清单)Daily / Frequent Sync(每日/高频同步)
Section titled “Daily / Frequent Sync(每日/高频同步)”短期 POC 可以每天或隔天同步:
- What changed?(有什么变化?)
- What did we learn?(学到了什么?)
- What is blocked?(什么被阻塞?)
- Did hypothesis change?(假设变了吗?)
重点是 Learning(学习),不是 Activity(活动量)。
End-of-POC Output(POC 收尾产出)
Section titled “End-of-POC Output(POC 收尾产出)”- Hypothesis Result(假设验证结果)
- Evaluation(评估数据)
- Technical Findings(技术结论)
- Limitations(局限)
- Cost Estimate(成本估算)
- Architecture Update(架构更新)
- Go / No-Go Recommendation(上/不上建议)