Risk & Issue Registry(风险与问题登记)
知识库位置:
FDE Knowledge Base/13 Operating System/06-Risk-and-Issue-Registry.md
Risk Registry(风险登记表)
Section titled “Risk Registry(风险登记表)”字段:
Risk ID(风险编号)Description(描述)Category(类别)Probability(概率)Impact(影响)Score(分值)Trigger(触发条件)Owner(责任人)Mitigation(缓解措施)Contingency(应急预案)Review Date(复核日期)Status(状态)Issue Registry(问题登记表)
Section titled “Issue Registry(问题登记表)”Issue(已发生问题)是已经发生的问题。
字段:
Issue ID(问题编号)Description(描述)Impact(影响)Severity(严重度)Owner(责任人)Opened(发生时间)Mitigation(缓解措施)Root Cause Status(根因状态)Target Resolution(目标解决时间)Current Status(当前状态)Risk vs Issue(风险与问题的区别)
Section titled “Risk vs Issue(风险与问题的区别)”Risk(风险):Security approval may delay launch.(安全审批可能延迟上线。)
Issue(问题):Security approval deadline has already been missed.(安全审批截止日期已被错过。)Categories(类别)
Section titled “Categories(类别)”- Business(业务)
- Customer(客户)
- Data(数据)
- Architecture(架构)
- Engineering(工程)
- Security(安全)
- Vendor(供应商)
- Schedule(进度)
- Adoption(用户采用)
- Production(生产)
- Value(价值)
Top Risks Rule(头部风险规则)
Section titled “Top Risks Rule(头部风险规则)”Overview(总览)页面始终只展示:
Top 3–5 Active Risks(前 3–5 个活跃风险)完整 Risk Register(风险登记表)可以更长。