跳转到内容

Gold Standard — 09 Decision Log(黄金标准:决策日志)

知识库位置:FDE Knowledge Base/06 Case Studies/Reference-Projects/01-Enterprise-Knowledge-Assistant/09-Decision-Log.md

ADR-001 — RAG instead of Fine-tuning(选 RAG 而非微调)

Section titled “ADR-001 — RAG instead of Fine-tuning(选 RAG 而非微调)”

Why(原因):

Knowledge changes frequently.(知识频繁变化。)
Citation required.(需要引用。)
Deletion / update must be controllable.(删除/更新必须可控。)

ADR-002 — Hybrid Search(混合检索)

Section titled “ADR-002 — Hybrid Search(混合检索)”

Why:

Vector search(向量检索)underperformed on(在以下场景表现不佳):

Error codes(错误码)
Product IDs(产品编号)
Internal acronyms(内部缩写)

ADR-003 — Permission Before Retrieval(检索前先过滤权限)

Section titled “ADR-003 — Permission Before Retrieval(检索前先过滤权限)”

Rejected(否决方案):

Retrieve all(检索全部)
→ Ask model not to reveal restricted content
(要求模型不透露受限内容)

Selected(选定方案):

Identity(身份)
→ Permission filter(权限过滤)
→ Retrieval(检索)

ADR-004 — API for Transactional State(事务状态走接口)

Section titled “ADR-004 — API for Transactional State(事务状态走接口)”

Question(问题):

Why not index ticket status?(为什么不索引工单状态?)

Decision(决策):

Current status must come from operational API.
(当前状态必须来自运营接口。)

ADR-005 — Workflow, not Agent(工作流而非智能体)

Section titled “ADR-005 — Workflow, not Agent(工作流而非智能体)”

Reason(原因):

The primary task is(主要任务是):

Retrieve(检索)
→ Synthesize(合成)
→ Answer(回答)

No dynamic multi-step action planning is required. (不需要动态多步行动规划。)