Delivery Tracker(交付跟踪)
知识库位置:
FDE Knowledge Base/13 Operating System/08-Delivery-Tracker.md
统一管理项目阶段:
Discovery(客户调研)Scoping(范围界定)Solution Design(方案设计)Prototype(原型)Pilot(试点)Production(生产)Scale(规模化)Phase Record(阶段记录)
Section titled “Phase Record(阶段记录)”每个阶段记录:
Objective(目标)Entry Criteria(进入条件)Start Date(开始日期)Owner(责任人)Key Activities(关键活动)Deliverables(交付物)Milestone(里程碑)Risks(风险)Exit Criteria(退出条件)Gate Decision(门禁决策)Milestone Tracker(里程碑跟踪)
Section titled “Milestone Tracker(里程碑跟踪)”| Milestone(里程碑) | Owner(责任人) | Target(目标日期) | Status(状态) | Dependency(依赖) | Evidence(证据) |
|---|
Dependency Tracker(依赖跟踪)
Section titled “Dependency Tracker(依赖跟踪)”尤其客户项目需要单独管理:
Dependency(依赖):Production CRM access(生产 CRM 访问)
Provider(提供方):Customer IT(客户 IT)
Needed By(需要时间):Pilot Week 2(试点第 2 周)
Impact(影响):Blocks real customer context(阻塞真实客户上下文)
Owner(责任人):Customer IT Lead(客户 IT 负责人)Dependency Health(依赖健康)
Section titled “Dependency Health(依赖健康)”建议依赖状态:
Not Started(未开始)In Progress(进行中)At Risk(有风险)Blocked(受阻)Complete(已完成)Dependency Criticality(依赖关键性)
Section titled “Dependency Criticality(依赖关键性)”标记:
Critical Path(关键路径)Important(重要)Non-blocking(不阻塞)例如:
Security Approval(安全审批)Critical Path(关键路径)
UI polish(界面打磨)Non-blocking(不阻塞)帮助 FDE 不被大量低价值事项分散注意力。
Action Tracker(行动跟踪)
Section titled “Action Tracker(行动跟踪)”统一:
Action(行动)Owner(责任人)Due Date(截止日期)Status(状态)Source(来源)Source 可以是:
- Meeting(会议)
- Risk(风险)
- Architecture Review(架构评审)
- Incident(生产事件)
- Gate Review(门禁评审)
Stage Gate System(阶段门禁系统)
Section titled “Stage Gate System(阶段门禁系统)”项目阶段之间建议正式设置 Gate(门禁)。
Gate 1 — Discovery → Scoping(调研→范围界定)
Section titled “Gate 1 — Discovery → Scoping(调研→范围界定)”必须证明:
Problem Validated(问题已验证)User Identified(用户已识别)Business Impact Understood(业务影响已理解)Gate 2 — Scoping → Solution Design(范围界定→方案设计)
Section titled “Gate 2 — Scoping → Solution Design(范围界定→方案设计)”Scope Agreed(范围已同意)Success Metrics Defined(成功指标已定义)Dependencies Known(依赖已知)Gate 3 — Solution Design → Prototype(方案设计→原型)
Section titled “Gate 3 — Solution Design → Prototype(方案设计→原型)”Architecture Direction Agreed(架构方向已同意)Critical Risks Identified(关键风险已识别)Experiment Plan Ready(实验计划就绪)Gate 4 — Prototype → Pilot(原型→试点)
Section titled “Gate 4 — Prototype → Pilot(原型→试点)”Critical Technical Hypotheses Proven(关键技术假设已证明)Known Limitations Documented(已知局限已记录)Pilot Value Hypothesis Exists(试点价值假设存在)Gate 5 — Pilot → Production(试点→生产)
Section titled “Gate 5 — Pilot → Production(试点→生产)”User Value Validated(用户价值已验证)Business Metrics Reviewed(业务指标已评审)Security Ready(安全就绪)Production Path Ready(生产路径就绪)Gate 6 — Production → Scale(生产→规模化)
Section titled “Gate 6 — Production → Scale(生产→规模化)”Stable Operations(运营稳定)Adoption Evidence(采用证据)Business Value Evidence(业务价值证据)Scale Economics Reasonable(规模化经济性合理)Gate Decision(门禁决策)
Section titled “Gate Decision(门禁决策)”统一使用:
GO(放行)
GO WITH CONDITIONS(有条件放行)
REWORK(返工)
STOP(终止)