Delivery Tracker(交付跟踪)

知识库位置:FDE Knowledge Base/13 Operating System/08-Delivery-Tracker.md

统一管理项目阶段:

Discovery(客户调研)
Scoping(范围界定)
Solution Design(方案设计)
Prototype(原型)
Pilot(试点)
Production(生产)
Scale(规模化)

每个阶段记录:

Objective(目标)
Entry Criteria(进入条件)
Start Date(开始日期)
Owner(责任人)
Key Activities(关键活动)
Deliverables(交付物)
Milestone(里程碑)
Risks(风险)
Exit Criteria(退出条件)
Gate Decision(门禁决策)

Milestone(里程碑) Owner(责任人) Target(目标日期) Status(状态) Dependency(依赖) Evidence(证据)

尤其客户项目需要单独管理:

Dependency(依赖):
Production CRM access(生产 CRM 访问)
Provider(提供方):
Customer IT(客户 IT)
Needed By(需要时间):
Pilot Week 2(试点第 2 周)
Impact(影响):
Blocks real customer context(阻塞真实客户上下文)
Owner(责任人):
Customer IT Lead(客户 IT 负责人)

建议依赖状态:

Not Started(未开始)
In Progress(进行中)
At Risk(有风险)
Blocked(受阻)
Complete(已完成)

Dependency Criticality(依赖关键性)

Section titled “Dependency Criticality(依赖关键性)”

标记:

Critical Path(关键路径)
Important(重要)
Non-blocking(不阻塞)

例如:

Security Approval(安全审批)
Critical Path(关键路径)
UI polish(界面打磨)
Non-blocking(不阻塞)

帮助 FDE 不被大量低价值事项分散注意力。


统一:

Action(行动)
Owner(责任人)
Due Date(截止日期)
Status(状态)
Source(来源)

Source 可以是:

  • Meeting(会议)
  • Risk(风险)
  • Architecture Review(架构评审)
  • Incident(生产事件)
  • Gate Review(门禁评审)

项目阶段之间建议正式设置 Gate(门禁)。

Gate 1 — Discovery → Scoping(调研→范围界定)

Section titled “Gate 1 — Discovery → Scoping(调研→范围界定)”

必须证明:

Problem Validated(问题已验证)
User Identified(用户已识别)
Business Impact Understood(业务影响已理解)

Gate 2 — Scoping → Solution Design(范围界定→方案设计)

Section titled “Gate 2 — Scoping → Solution Design(范围界定→方案设计)”
Scope Agreed(范围已同意)
Success Metrics Defined(成功指标已定义)
Dependencies Known(依赖已知)

Gate 3 — Solution Design → Prototype(方案设计→原型)

Section titled “Gate 3 — Solution Design → Prototype(方案设计→原型)”
Architecture Direction Agreed(架构方向已同意)
Critical Risks Identified(关键风险已识别)
Experiment Plan Ready(实验计划就绪)

Gate 4 — Prototype → Pilot(原型→试点)

Section titled “Gate 4 — Prototype → Pilot(原型→试点)”
Critical Technical Hypotheses Proven(关键技术假设已证明)
Known Limitations Documented(已知局限已记录)
Pilot Value Hypothesis Exists(试点价值假设存在)

Gate 5 — Pilot → Production(试点→生产)

Section titled “Gate 5 — Pilot → Production(试点→生产)”
User Value Validated(用户价值已验证)
Business Metrics Reviewed(业务指标已评审)
Security Ready(安全就绪)
Production Path Ready(生产路径就绪)

Gate 6 — Production → Scale(生产→规模化)

Section titled “Gate 6 — Production → Scale(生产→规模化)”
Stable Operations(运营稳定)
Adoption Evidence(采用证据)
Business Value Evidence(业务价值证据)
Scale Economics Reasonable(规模化经济性合理)

统一使用:

GO(放行)
GO WITH CONDITIONS(有条件放行)
REWORK(返工)
STOP(终止)