Quick Reference Matrix(速查矩阵)
知识库位置:
FDE Knowledge Base/09 Field Guides/17-Quick-Reference-Matrix.md
| Situation(情景) | First Move(第一步) | Primary Module(主模块) |
|---|---|---|
| “We want AI”(我们想要 AI) | Ask business outcome(问业务结果) | Business(业务) |
| Customer unclear(客户不清楚) | Map process(画流程) | Business |
| No data(没数据) | Find owner / constraint(找责任人/约束) | Business + Data(业务 + 数据) |
| Poor data(数据差) | Quantify critical quality gaps(量化关键质量缺口) | Engineering(工程) |
| Security blocked(安全受阻) | Convert concern into requirements(把顾虑转成需求) | Architecture(架构) |
| Wants autonomy(要自动化) | Risk-tier actions(按风险分级) | Architecture |
| Wants real-time(要实时) | Define latency requirement(定义延迟要求) | Engineering |
| POC stuck(POC 卡住) | Production gap assessment(生产差距评估) | Delivery(交付) |
| Low adoption(采用率低) | Diagnose adoption funnel(诊断采用漏斗) | Business |
| Scope creep(范围蔓延) | Change control(变更控制) | Delivery |
| Wants ROI(要 ROI) | Build scenario model(建情景模型) | Business |
| Production incident(生产事故) | Restore first(先恢复) | Troubleshooting(问题排查) |