API Integration Checklist(API 集成检查清单)
知识库位置:
FDE Knowledge Base/03 Engineering/Checklists/API-Integration-Checklist.md
Contract(契约)
Section titled “Contract(契约)”- Endpoint(接口端点)已确认
- Request Schema(请求结构)已确认
- Response Schema(响应结构)已确认
- Error Codes(错误码)已整理
- Version(版本)已明确
Authentication(认证)
Section titled “Authentication(认证)”- Authentication Method(认证方式)已明确
- Credential(凭证)来源安全
- Token Expiration(令牌过期)已处理
- Token Refresh(令牌刷新)已实现
Authorization(授权)
Section titled “Authorization(授权)”- Permission Scope(权限范围)最小化
- Service Account(服务账号)权限已检查
- User-context Permission(用户上下文权限)已确认
Reliability(可靠性)
Section titled “Reliability(可靠性)”- Timeout(超时)已设置
- Retry Policy(重试策略)已定义
- Rate Limit(限流)已了解
- Circuit Breaker(熔断器)是否需要已评估
Data(数据)
Section titled “Data(数据)”- Sensitive Fields(敏感字段)已识别
- Required Fields(必填字段)已确认
- Null / Missing Data(空值/缺失数据)已处理
- Schema Change(结构变更)风险已考虑
Operations(运维)
Section titled “Operations(运维)”- Request ID / Trace ID(请求 ID/链路 ID)可追踪
- API Failure(接口失败)有 Alert(告警)
- Sandbox / Test Environment(沙箱/测试环境)已验证
- Production Credential(生产凭证)与 Test(测试)分离