ARCH-v1.0 — Production(生产架构)
知识库位置:
FDE Knowledge Base/06 Case Studies/Reference-Projects/01-Enterprise-Knowledge-Assistant/08-Architecture/ARCH-v1.0-Production.md
Sources(来源)↓Managed Connectors(托管连接器)↓Parsing(解析)↓Metadata Validation(元数据校验)↓Version / ACL Processing(版本/访问控制处理)↓Index(索引)
User(用户)↓SSO(单点登录)↓Application(应用)↓Query Router(问题路由器)├─ Knowledge(知识型)│ ↓│ Permission-aware Hybrid Retrieval(权限感知混合检索)│ ↓│ Reranker(重排序器)│ ↓│ Context Builder(上下文构建器)│ ↓│ LLM(大语言模型)│ ↓│ Citation Validation(引用校验)│└─ Transactional(事务型) ↓ Enterprise API(企业接口)
All paths(全路径)↓Observability(可观测性)Audit(审计)Feedback(反馈)Evaluation(评估)